2026 International Symposium on Academic Innovation & Industrial Development of Turbomachinery,Xinjiang Oil & Gas and Electric Power Energy Industry Symposium
2026-02-27

Against the background of the deep implementation of the “Dual Carbon” strategy, the accelerated transformation of the energy structure, and the pursuit of self-reliance in high-end equipment, turbomachinery, as core equipment in the energy and power sector, is facing a critical opportunity for technological innovation and industrial upgrading.The deep integration of traditional and new energy sources has placed higher requirements on the customized design and diversified applications of turbomachinery to adapt to multiple scenarios and systems. Turbomachinery technologies are also rapidly developing toward high efficiency, low carbon, digital intelligence, coupled design optimization, and high-end manufacturing.As an important strategic base in China, Xinjiang boasts abundant energy resources, accelerated industrial development and upgrading, and unique geographical advantages for equipment export. It has strong demand and broad application space for high-end turbomachinery.Therefore, the 2026 grand event for the turbomachinery industry will be held in Xinjiang, focusing on academic innovation and industrial opportunities, to build a high-end platform for global academic exchange and industrial cooperation in turbomachinery. We will gather industrial wisdom, tackle bottlenecks in industrial development, and launch the grand 2026 International Conference on Academic Innovation & Industrial Development of Turbomachinery & Xinjiang Oil & Gas and Electric Power Energy Industry Summit.
I. Conference Organization
Guiding Units:Development and Reform Commission of Xinjiang Uygur Autonomous Region Department of Ecology and Environment of Xinjiang Uygur Autonomous Region Council for the Promotion of International Trade of Xinjiang Uygur Autonomous Region
Organizer:Council of International Turbomachinery R&D, Economy and Trade
Undertaker:Jiaxing Zengyu Turbine Technology Co., Ltd.
Co-organizers:Dongfang Turbine Co., Ltd. of Dongfang Electric Corporation,Harbin Turbine Company Limited,Shanghai Turbine Works Co., Ltd.,Shanghai Electric Gas Turbine Co., Ltd.,AECC Gas Turbine Co., Ltd.,Hangzhou Steam Turbine Power Group Co., Ltd.,Chengdu Chengfa Keneng Power Engineering Co., Ltd..Shanghai Electric Blower Works Co., Ltd.,Fushun Elida (Shanghai) Compressor Co., Ltd.
Supporting Units:Pipe China Xinjiang Branch Petro China Karamay Petrochemical Company,Petro China Tarim Oilfield Company,China University of Petroleum (Beijing) Karamay Campus,Xinjiang Goldwind Science & Technology Co., Ltd.,Xinjiang Guanghui Petroleum Co., Ltd.
II. Time & Venue
Registration: August 21, 2026 (10:00–22:00)
Conference Dates: August 22–23, 2026
Venue: Xinjiang Guest House
Address: No. 1192 Yan’an Road, Urumqi
Hotel Tel: 0991-6072222
III. Conference Theme
Academia Leading the Frontier, Industry Empowering the Future
– New Paths for Turbomachinery Technological Innovation and Industrial Integration
IV. Conference Topics
Topic 1: Coupling Optimization of Aerodynamics, Mechanics, Structure, Combustion, Heat Transfer and Advanced Design Methods
Invited international experts will share cutting-edge research in aerodynamics, mechanics, structure, combustion, heat transfer, including:
Unsteady flow control, ultra-high-speed aerodynamic optimization, new aerodynamic layouts
Low-emission and multi-fuel adaptation, micro-mixing combustion, staged combustion
Film cooling heat transfer models, high-efficiency heat transfer, supercritical CO₂ heat transfer enhancement
Multi-field coupling modeling: aerodynamics – heat transfer – structure
Ultra-high-speed rotor dynamics, nonlinear vibration control, lightweight high-strength turbine disks.
Topic 2: New Product Breakthroughs and Xinjiang Regional Market Opportunities
Based on innovative achievements in turbomachinery, combined with Xinjiang’s energy industry and policies, we will explore market demand and cooperation potential.
(1) New Products & Technological Breakthroughs in Key Fields
Aero-derivative gas turbines for deep oil & gas, pipeline compressors, shale oil core equipment
Supercritical CO₂ waste heat turbines, megawatt natural gas residual pressure expanders, liquid hydrogen expanders
CCUS-dedicated turbomachinery: corrosion-resistant CO₂ compressors, large-flow CO₂ boosting units
3D curved-twist blade steam turbines, double reheat ultra-supercritical steam turbines
Gas turbines in integrated energy parks, distributed energy, small/micro gas turbines
Energy-saving turbocompressors and steam turbines for coal-to-gas and coal chemical industries.
(2) Xinjiang Regional Market Opportunities & Policy Adaptation
Focus on applications in oil & gas exploitation, gas pipelines, coal-to-gas, coal chemical processing, new power systems, energy-saving retrofits in chemical industrial parks.
Topic 3: Intelligent Operation & Maintenance, Energy-saving Retrofits, and Localization of Core Components
(1) Intelligent O&M Systems
From passive response to predictive maintenance, from manual to intelligent autonomy.
Focus on:
AI + digital twin
AI-driven predictive maintenance
Full-link digitalization
Green O&M integrated with carbon footprint management
Energy-saving retrofit cases for CCGT systems
Vibration monitoring, fault prediction and early warning.
(2) Localization Breakthroughs of Core Components
High-temperature materials, 3D-printed turbine blades, precision machining, sealing systems, bearings, high-power high-speed direct-drive motors, etc.
V. Participants & Scale
Technical directors, R&D leaders, and key engineers of turbomachinery OEMs Experts and scholars from universities and research institutes worldwide Representatives from upstream and downstream energy enterprises and investment institutions Expected attendance: about 700 participants.
VI. Conference Format
Keynote Speeches Specialized Sub-forums Technical Exhibition Industry-University-Research Matchmaking.
VII. Concurrent Exhibition
Venue: Conference Center, Xinjiang Guest House
Exhibition Setup: August 21, 2026 (19:00–22:00)
Exhibition Dates: August 22–23, 2026
Exhibit Scope:
Main Equipment: aero-engines, gas turbines, steam turbines, compressors, blowers, fans, expanders, turbochargers, pumps, water turbines.
Auxiliary Systems: motors, impeller & blade machining, bearings (air/magnetic), seals, couplings, clutches, balancing machines, inverters, electric barring gears, processing equipment, anti-corrosion & wear-resistant materials, simulation software, lubricants, instruments, control systems, alignment devices, coolers, etc.
VIII. Registration & Fees
1. Registration Fee
Category | Early bird Price (RMB/person) before 30 June 2026 | Standard Price (RMB/person) |
| Standard | 2400 | 2900 |
Speakers/Sponsors | 2000 | 2500 |
Member units | 1800 | 2300 |
Students | 1500 | 2000 |
2. Registration & Payment
Online registration & payment: https://www.turboinfo.net
Bank Transfer:
Payee Name (户名):Jiaxing Zengyu Turbine Technology Co., Ltd.(嘉兴市锃屿透平技术有限公司)
Account Number:33050163805800001157
Bank (开户行):China Construction Bank Corporation Jiaxing Baishu Sub-branch
(中国建设银行股份有限公司嘉兴百墅支行 )
Bank Code (行号):105335000162
3. Accommodation
This Meeting will be held at the Conference Center of Xinjiang Yingbin Hotel. As an ecological garden-style hotel, it is a designated venue for high-level government conferences and official receptions. The hotel compound is home to several independent buildings, including Building 1, Building 9, Villa Building, and Xinjiang Aid Building, featuring separate structures and an elegant environment.
All the participants who wish to book accommodation at Xinjiang Yingbin Hotel can enjoy the preferential rate for this conference. However, you are required to confirm the accommodation reservation at the same time when registering on the official website (https://register.turboinfo.net/cn/home). After completing the online registration, you need to pay the accommodation fee simultaneously (the accommodation fee is non-refundable). Only reservations with the accommodation fee paid successfully will be deemed valid.
Guest House | Standard Room (2 breakfasts) | King Room (1 breakfast) | Suite (2 breakfasts) |
No.3-4 Building | RMB 350 per room per night | RMB 350 per room per night | RMB 550 per room per night |
No.9 Building | RMB 440 per room per night | RMB 520 per room per night | RMB 840 per room per night |
Villa Area | RMB 600 per room per night | RMB 600 per room per night | RMB 1100 per room per night |
Accommodation Booking & Payment Method:
When registering online via the conference official website, select the room type and check-in/check-out dates in the hotel booking section.After completing the booking, accommodation fees must be paid offline. A booking is considered valid only upon successful payment.No booking cancellations or refunds will be allowed after June 30, 2026.
Accommodation fees can be paid via either of the following two methods:
1.Pay the accommodation fee to the meeting organizing office (Modifications to check-in/check-out dates and room quantity are supported at any time)

2.Payment of accommodation fee directly to the hotel (Hotel refund process takes 2.5 months)
At the time of payment, please add the remark "turbo + Guest Name + Company Name".Since the accommodation fee is paid directly to the hotel, changes to room quantity, room type or check-in dates are not allowed.It will take approximately 1 week for the payment to be verified and confirmed.If a refund is required, a copy of the ID card (both front and back) and bank card (both front and back) must be provided.Hotel refund process takes 2.5 months.
2.1Bank trasnfer:
Account Name:Xinjiang Yingbin Hotel 新疆迎宾馆
Account Number:30002801040004607
Bank Name:农业银行乌鲁木齐延安路支行
2.2 Scan to Pay:

The 2026 International Conference on Academic Innovation & Industrial Development of Turbomachinery & Xinjiang Oil & Gas and Electric Power Energy Industry Summit is both an academic feast of cutting-edge technologies and an industrial event focusing on regional market opportunities.We sincerely invite technical elites, R&D backbones, and enterprise leaders in the turbomachinery industry to gather and jointly write a new chapter of high-quality development!
IX. Contact Information
Website: https://www.turboinfo.net
E-mail: turbomachinerycita@163.com
Tel: 18069667699, 18067060580, 18067005962
Cutting-edge Technology
- Everllence to Supply Compressor Technology for Thailand’s First CCS Project
- R&D Project Takes Step Towards CO₂-Neutral Propulsion
- U.S. Rodatherm Energy Shares Key Factors for the Future Development of Geothermal Energy
- The combustion chamber test platform of the national major science and technology infrastructure "High-Efficiency and Low-Carbon Gas Turbine Test Facility" has passed the performance and process tests